Certification: | CE, ISO, FDA, UR, PCI, PDA, CE |
---|---|
Control System: | PLC |
Single Glass Thickness: | 3~12mm |
Still deciding? Get samples of US$ 59000/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Section 01 Input Section:
The glass will be transfered to section 2(washing and drying section).Carbon fiber conductive brushes are used for coating glass and Low-e glass detection.
Section 02: Washing and Drying section
The washing zone and water tank are made of stainless steel and corrosion-proof material, water heating function is available. And all bearing bases are made of stainless steel.
Section 03:Convey and Light Inspection Section
This section with open design, if the glass is not clean enough, the worker can go through the back door to wipe the glass.
Section 04: The Flip table
This table can be tilted when we place the super spacer on glass.
The Flip table has suck and release function, the operator can place the super spacer very easy and safe.
Section 05: Panel press section
The panel press is controlled by Servo motor.Denser steel frame for a stronger machine body. Each suction cup in the panel press equipped with one separate logic valve, and the suction cups work partitioned according to the size of the glass.
Max. glass size
|
2500*3000mm
|
Min. glass size
|
500*300mm
|
Pane glass thickness
|
3-12mm
|
Max. Insulating glass thickness
|
12-40mm
|
Glass washing speed
|
3-12m/min
|
Working speed
|
2-48m/min
|
Air pressure
|
0.8m³/min
|
Water electrical conductivity
|
≤40µS/cm
|
Overall dimension
|
22700*2300*3400mm |
Voltage | 220V/60 or customized |
Total power | 27kw |
1. Which countries does your products exported to?
A: Our equipments have been exported to 50 Countries and regions, such as South Amercia,South
Africa,India,Turkey,Canada,Russia,European Countries and so on.
2. How to use your glass processing machiney?
A: We have paper instructions in English, and we will teach till you do it well.
3. What about quality control?
A: The whole production procedure will be under regular inspection and strict quality control. We'll inspect every component before using. The complete machine will be tested to make sure it can work very well before being out of the factory.